HKS 1410-SA008
HKS Blowoff Valve Components 1410-SA008 Instruction Manual
Model: 1410-SA008 | Brand: HKS
1. Ynlieding
This instruction manual provides essential information for the HKS Blowoff Valve Components, model 1410-SA008. These components are designed as optional parts for the HKS Super SQV (Sequential Blow Off Valve) system. Please note that the Super SQV body is sold separately. This manual covers product overview, general setup guidelines, operational considerations, maintenance tips, troubleshooting advice, and detailed specifications to ensure proper use and longevity of your HKS components.
2. Produkt Overview
The HKS Blowoff Valve Components 1410-SA008 are precision-engineered parts intended to enhance or replace specific elements within an HKS Super SQV system. Understanding each component's role is crucial for correct installation and function.

Ofbylding 1: Front view of the HKS Blowoff Valve Component. This image displays the main body of the component, highlighting its transparent construction and the central mechanism.

Ofbylding 2: Side view of the HKS Blowoff Valve Component. This perspective shows the cylindrical shape and the connection points on either side, indicating its inline installation design.
3. Opset en ynstallaasje
These components are designed for integration with an existing HKS Super SQV system. Proper installation is critical for optimal performance and to prevent damage. It is recommended that installation be performed by a qualified professional.
- Tarieding: Ensure the vehicle's engine is off and cooled down. Disconnect the battery's negative terminal to prevent accidental electrical issues.
- Identifisearje lokaasje: Refer to your HKS Super SQV main unit manual to identify the specific location where this component is to be installed or replaced.
- Component Integration: Carefully connect the component, ensuring all fittings are secure and airtight. Use appropriate tools and avoid over-tightening.
- Vacuum Line Connection: If applicable, connect any vacuum lines according to the Super SQV system's diagram. Verify all connections are free from kinks or leaks.
- Finale kontrôle: Kontrolearje alle ferbiningen nochris en soargje derfoar dat der gjin ark of pún yn 'e motorromte efterbliuwe. Ferbine de batterij opnij.
Note: Specific installation steps may vary depending on the Super SQV model and vehicle application. Always consult the primary Super SQV manual for detailed instructions.
4. Operaasje
As these are components for a larger system, their operation is directly tied to the HKS Super SQV. Once correctly installed, these components function automatically as part of the blowoff valve system, regulating boost pressure and releasing excess pressure when the throttle is closed.
- Systeemyntegraasje: The component operates in conjunction with the Super SQV to ensure efficient pressure release.
- Optreden: Proper functioning of this component contributes to the overall responsiveness and longevity of your turbocharged engine by preventing compressor surge.
- Lûd: Depending on the specific component and Super SQV setup, it may influence the characteristic blowoff sound.
No user intervention is required for the operation of these specific components once installed.
5. Underhâld
Regular inspection and maintenance of your HKS Super SQV system, including these components, will ensure continued performance and reliability.
- Visuele ynspeksje: Periodically check the component and its connections for any signs of wear, cracks, or leaks. Ensure all hoses are securely attached.
- Reiniging: If the component is a filter or requires cleaning, follow the specific instructions provided in the main HKS Super SQV manual. Use only recommended cleaning agents.
- Ferfanging: These components are designed for durability, but like all automotive parts, they may require replacement over time due to wear or degradation. Refer to the HKS Super SQV manual for recommended service intervals.
Always use genuine HKS replacement parts to maintain system integrity and performance.
6. Probleemoplossing
If you experience issues with your HKS Super SQV system after installing these components, consider the following general troubleshooting steps. For detailed diagnostics, consult a professional or the main Super SQV manual.
- Boost Leak: Check all connections, including those to this component, for any signs of leaks. A loose connection can lead to reduced boost pressure.
- Improper Sound: If the blowoff sound is incorrect or absent, verify that the component is installed correctly and that all vacuum lines are properly connected and free of obstructions.
- Problemen mei motorprestaasjes: If engine performance is negatively affected, immediately check for correct installation and ensure no lines are pinched or blocked.
If problems persist, it is advisable to seek assistance from an authorized HKS dealer or a qualified automotive technician.
7. Spesifikaasjes
| Attribute | Detail |
|---|---|
| Merk | HKS |
| Model | FBA_1410-SA008 |
| Item Gewicht | 0.353 oz |
| Item Model Number | 1410-SA008 |
| Fabrikant Part Number | FBA_1410-SA008 |
| ASIN | B00MM0M30Q |
| Datum Earste Beskikber | 1 desimber 2014 |
8. Garânsje en stipe
For specific warranty information regarding the HKS Blowoff Valve Components 1410-SA008, please refer to the documentation included with your original HKS Super SQV purchase or visit the official HKS webside. Garânsjebetingsten en -kondysjes kinne ferskille per regio en produkt.
For technical support, installation assistance, or inquiries about genuine HKS parts, please contact HKS customer service directly or consult an authorized HKS dealer. Official contact information can typically be found on the HKS corporate website.
Relatearre dokuminten - 1410-SA008
![]() |
Ynstallaasjegids foar HKS Super SQV Return Set (71002-AN002) Ynstallaasje-ynstruksjes foar de HKS Super SQV Return Set (ûnderdielnûmer: 71002-AN002), ûntworpen foar ECR33- en ER34-modellen. Dizze hantlieding beskriuwt it proses fan it ynstallearjen fan de retourfitting, it oanpassen fan slangen en it opnij gearstallen fan komponinten. |
![]() |
HKS EVC-S2 Electronic Valve Controller Instruction Manual Comprehensive instruction manual for the HKS EVC-S2 Electronic Valve Controller, detailing installation, operation, features, and troubleshooting for turbocharged engines. |
![]() |
Toyota 1UZ-FE-motor: Spesifikaasjes en funksjes Detaillearre technyske oersjochview fan 'e Toyota 1UZ-FE V8-motor, mei spesifikaasjes, prestaasjekarakteristiken, wichtige funksjes en komponintdetails foar de LS400 sedan. |
![]() |
IMPCO Model 425 Carburetor: Specifications, Components, and Assemblies Comprehensive technical details for the IMPCO Model 425 carburetor, including specifications, dimensions, a detailed component breakdown, and available assemblies and accessories for LPG and Natural Gas applications. |
![]() |
Toyota 2UZ-FE PCV System Components: Positive Crankcase Ventilation Guide Detailed guide to the Positive Crankcase Ventilation (PCV) system components for the Toyota 2UZ-FE engine, including PCV valve, hose, and cover, with torque specifications. |
![]() |
AE Valves and Components Catalogue 2013-2014 | Federal-Mogul Aftermarket Comprehensive AE Valves and Components Catalogue (2013-2014) from Federal-Mogul, featuring OE quality engine parts for a wide range of vehicle manufacturers. Includes valve guides, valve seats, and application data. |
Ask a question about this manual
Ask about setup, troubleshooting, compatibility, parts, safety, or missing instructions. Manuals+ will review the question and use this page’s manual context to help answer it.





